Home News
View Larger
View Larger
View Larger

Headline
Central DuPage Hospital Proton Therapy Center.
Detail

PROJECT LOCATION:
Warrenville, IL


CLIENT:
ProCure Inc./CDH




Load Test of Proton Beam
20 Ton Capacity Hydraulic
Jack with Calibrated Load
Cell & Digital Load Reader

Detailed Narrative Description of Project & Services provided:
Design Consulting Engineers (DCE) was selected by ProCure/CDH to provided complete Construction Material Testing and Inspection Services for the new CDH Proton Therapy Center in Warrenville, IL. This project involved a auger cast deep pile foundation system, and massive concrete pour in the Therapy Center’s Gentry Room. DCE’s involvement on this project was to provide review of shop drawings for foundation, concrete, and structural steel.


Activities of this Project:

  • Review and inspection of auger cast deep pile foundation system
  • Review and inspection of pile load testing
  • Inspection and testing massive concrete including high-density shield concrete
  • Inspection, and testing of structural steel welding
  • Inspection of internal concrete temperature using Maturity Meters
  • Inspection and testing of fire proofing
  • Inspection and testing of proton beam load test for a capacity of eleven (11) tons
  • Quality control plan monitoring
  • Preparation and submission of daily reports via email to all relevant parties
  • ubmission of final monthly reports
© Copyright Design Consulting Engineers, Inc. - All rights reserved.